Dynamic rockfall barriers on a rock face above a railway tunnel entrance

9000 kJ dynamic barriers: maximum safety for railway infrastructure

9000 kJ dynamic barriers: maximum safety for railway infrastructure

At Solutioma, we strengthen railway safety on the Lleida – La Pobla de Segur line with dynamic barriers of 9000 kJ and 5000 kJ.
Thanks to our specialised team, we take on projects in hard-to-reach areas, performing highly complex operations with total coordination.

Facing risks in critical areas requires highly specialised teams

We know that every protection project requires much more than just installing a standard solution.
It takes a team that understands the terrain, that can operate in complex environments, and works with maximum safety.

The Lleida – La Pobla de Segur railway line runs through mountainous areas that are especially exposed to rockfalls. Therefore, it was necessary to intervene in critical sections where rockfalls could impact the railway infrastructure and passenger safety.

Our experience in slope stabilisation and geotechnical risk prevention allows us to take on key projects like this one.

The Solution: 9000 kJ dynamic barrier and Solutioma’s technical expertise

In this case, the solution combined large dynamic barriers with a high energy absorption capacity of 9000 kJ and 5000 kJ.

These dynamic barriers, uncommon due to their complexity and power, require specialised technical resources and skilled human teams.

Thanks to our experienced and highly specialised team, we were able to take on this challenge, ensuring quality, safety, and execution within a record timeframe.

9,000 kJ dynamic rockfall barriers above a railway line next to a tunnel entrance
Operatives working at height assembling a dynamic rockfall barrier on a cliff

Hard-to-reach areas: helicopter operation

The biggest challenge was to carry out the work without interrupting railway service and to access the complex area where the large barriers were installed in gallery mode.

We planned and executed a combined operation using helicopter transport to deliver the modules precisely, ensuring faster completion of the works.

B
  • This operation required meticulous coordination at every stage, acting with maximum safety and speed during the transport and installation of dynamic rockfall protection barriers.
  • The combination of working at heights, specialised assembly, and aerial access highlights the unique value we bring to projects of this scale.

Technical coordination to ensure railway safety

In this project, we worked closely with Ferrocarrils de la Generalitat de Catalunya and the Institut Cartogràfic i Geològic de Catalunya throughout all project phases.
From the initial planning to the final execution, our technical team operated in perfect coordination with all involved parties.

The success of the project —with the incorporation of the dynamic rockfall protection barriers— was the result of combining experience, adaptability, and the highest technical standards.

9,000 kJ dynamic rockfall barriers above a railway line beside a river
View from above of the dynamic rockfall barriers over the railway in the valley

Our commitment: meeting the most demanding challenges

At Solutioma, we have highly qualified professionals, our own resources, and the capacity to act in the most challenging conditions and highest-risk environments.

Our commitment is to keep providing tailored solutions, ensuring both people’s safety and the protection of critical infrastructures.

In this project, the combination of dynamic rockfall barriers with the expertise of our team became the key to securing and protecting the railway line, its trains, and its passengers.

We continue building a safer future!

Helicopter and operatives during the installation of dynamic rockfall barriers on a hillside

Contact

Contact us

  • +34 900 101 895
    Call us if you prefer
  • solutioma@solutioma.com
    Write to us directly
  • Over 30 years of experience
    Survey, design and execution with our own team and machinery
  • Offices in Spain and Romania
    Lleida, Madrid, Canary Islands, Jaén, Gipuzkoa and Bucharest